Disposable hard PVA mop refill Sponge mop head
Specifications
1. Soft PVA sponge refill 28cm.
2. PVA sponge has good absorbency, super cleaning ability.
3. The refill for item MC10-1265-11
Item No | MC13-1265-11 |
Size | 28cm |
Material | PVA sponge |
Packing | Color card +pp bag;48pcs/ctn |
Disposable hard PVA mop refill Sponge mop head
1.put the mop head into water until it is fully soft before use.
2.Squeezing out water more easily and completely without dirtying your hands.
3.when the mop head is out of service,you can fix a new one.
4.Ideal for cleaning and drying smooth surface as floorboards,tiles,glass,showcase,
5.Hanging Conveniently Plastic Cover
6.Ergonomic And Labor-Saving Plastic Puller
The advantage of the import of the
mop part:
1.reduce the cost of the tariffs
2.assemble the products in accordence with your require
3.save the container's space and ship more
4. high efficient cleaning ability.
Washable PVA mop refill Sponge mop head
1.Super water absorbent capacity for
PVA sponge mop head,it could easily absorb water,hair,dust,juice,sauce on the floor,tile and so on;
2.The
mop head is cleaned by flushing water,and squeezed out water by folding support;
3.The
PVA sponge can be renewal if the orignal one use out;
4.The refill is packaged. Peel off cover before use
5.Changeable heads make cleaning effective and efficient
6.Wide usage: floor, windows and many surfaces in public places.
7.To know more detail&latest quotation,please send email to us,thanks!
Packaging & Delivery
Packaging Details: | Color card, 48pcs/ctn |
---|
Delivery Detail: | 30days after we receive the deposit |
In-process management procedures |
1.According to production requirements,logistics is resposible for establishing EHS requirements,rational layout of the production enviroment,production department to maintain the production according to 5S management requirements,to a special enviromental in equipment or procedures,need to have a formal document specify that the staff must strictly enforce,on the anti-static requirements of the process and location,must operate strictly in accordance with the guidance document and the corresponding documentation for operation. |
2.Engineering resposible for equipment maintenance, specific maintenance contents fefer to production equipment control procedures. |
3.Production resposible for assist materials control Department of the online materials,and manage scrap units. |
3.Production control production line output according to plans,use the "production internal maintenance form"record and track human,machines,materials and technics abnormity in produce process;quality control/Engineering Department make a patrol inspection on the production line to control the production process quality.According to the process and equipment characteristics,the production process will be devided into general process,key process,and special process for different levels of control. |
4.1 General process control |
4.1.1 Before production,should confirm raw materials preparation,equipment status,operation guide books,staff skills. |
4.1.2 Strictly operate in accordance with the guidance books,through the operator self-inspect,multi- inspect and QA patrol inspect for real-time monitoring quality. |
4.1.3 The feedback of fluctuate process:promote production management principles. |
4.1.4 The defective in prodction operate according to "Defective control procedue" |
4.1.5 Record and stat production status |
4.2 Key process control |
According to product characteristics,the company confirm the fire detector calibration processes and functions of mobile detector test processes for key processes. |
4.2.1 Pre-production with the test samples could confirm whether the equipment used for the production and make records. |
4.2.2 Quality selective inspect of the fire detector sensitivity to control the accuracy of calibration. |
4.3 Special process control |
According to product characteristics,the company confirm SMT,reflow solder,hands and wave soldering process for the special process and the specific special control refer to "special process control procedure". |
5.Production process should be operational by guide book guide,operation guide book shall be in writing in pictures combined description code,and pay attention items and quality standards. |
6.Quality records requirement in the process should follow the related contents of Record control procedure". |
7.After the end of production,after the inspection and acceptance by quality control,the packing storage,warehouse confirm quantities and arrange every lot intergated qualified products to meet the quantities request of shipment orders.If the inventory were stored for more than three months and need to ship,the materials control department supply appliactions,after the production rework,the inspector re-inspect,and passing inspection,then shipment. |
Professional supervision Loading
Carton Fair we've attended
Company Certificates
Workshops review:
Company tenet:
With the mission of customers first,quality oriented,Ningbo Master Clean Commodities Co.,Ltd. pays special attention to technology innovation and quality stability,and offer best quality products and services to customers and clients warmheartedly to satisfy customers.